Process & technical water
Closed-loop cooling water for data halls, process equipment and critical environments.
Mission-critical mechanical · Louisiana & the Gulf South
Complete Mechanical Contractors installs the technical water, process cooling and central plant piping that keeps data centers running, from the first model to the final flush.
Hyperscale and colocation work is repetitive by design: the same loops, the same gallery runs, hall after hall. We plan for that repetition so crews, material and schedule move together, and we protect the finished building while we work in it.
| Line tag | System | What we deliver |
|---|---|---|
| TW-S / TW-R | Technical water loops | Supply and return loops around each hall, with isolation valves sequenced so a section can come out of service without taking the hall down. |
| GAL-01–48 | Gallery runs | Repeated branch runs from the loop to the cooling equipment, laid out once in the model and installed to the same detail every time. |
| SS-316L | Stainless piping | TIG-welded stainless lines, purge-gas planning, and passivation coordinated with a specialist before the system is filled. |
| CHW / CW | Central plant | Chillers, cooling towers, pumps, buffer and expansion tanks, and air separators, with long-lead equipment tracked from day one. |
| OFCI | Owner-furnished pipe | Receiving, tagging and setting owner-furnished spools to the coordinated model, with any field rework documented before it starts. |
| SUPT | Supports & hangers | Support layouts submitted for approval and built to the engineer's details, at fittings and along every straight run. |
Loops often run 20 feet or more above a finished slab. We plan lifts, laydown and access before mobilizing so the floor stays protected.
When welding inside the building isn't permitted, gallery piping is prefabricated in the shop or a staging area and brought in ready to set.
Delegated design, support details and owner-furnished material are written into the agreement before we sign, so there are no surprises at closeout.
We carry the piping scope from preconstruction through commissioning support, so the general contractor has one accountable mechanical team on site.
Closed-loop cooling water for data halls, process equipment and critical environments.
Chilled water, condenser water and heating hot water systems tied into existing infrastructure.
TIG and orbital welding, cleanliness controls, and passivation for systems that can't tolerate contamination.
Spools and assemblies built in a controlled shop environment, tagged to the model and delivered when the site needs them.
Revit modeling and Navisworks clash coordination with the design team and other trades before anything is fabricated.
Pressure testing, flush and fill, and closeout documentation handed over ready for commissioning.
Welding a spool on a stand in a controlled shop beats welding it 20 feet up over a finished floor. We move as much of the work as we can off site, then deliver it tagged and ready to set.
Every project follows the same sequence. Most problems on a critical job are cheaper to solve in the model or the contract than in the field.
Constructability review, scope clarifications and long-lead procurement.
BIM coordination and clash review with every trade in the space.
Shop spools and assemblies built to the coordinated model.
Repeatable install sequences, hall by hall, with daily progress tracking.
Pressure testing, passivation and flush and fill to spec.
Documentation, as-builts and support through commissioning.
Safety is planned into the job the same way the piping is: before the work starts, by the people doing it.
We're building crews for upcoming mission-critical projects in Central Louisiana. If you take pride in clean welds and straight runs, we want to talk.
Apply: careers@compmechanical.comSend us drawings, a scope or just a question. We respond to bid invitations and project inquiries within one business day.
Office
3121 Country Club Rd, Suite A
Lake Charles, LA 70605
Phone
Service area
Louisiana and the Gulf South